Paiwan Wisdom
Print Baltic99   
IMO/VIN Callsign Flag Service Year
9427122 3EWR5 PANAMA Freight Ship 2010
Activity# Port Date Activity - Description Deficiencies
6095296 New Orleans, Louisiana Mar 02, 17 Vessel Inspection - Approved Inspection
5807224 San Pedro, California Feb 01, 16 Vessel Inspection - Approved Inspection
  1
SystemSubsystemCause
Fire FightingFiremans Outfit
DescriptionDue DateResolved
74SOLAS (2014 CONS) CH II-2 REG 10.1.1 FSS CH 3.2.1.1.1 17ac Fire fighter's outfit shall comply with the Fire Safety Systems Code. Personal equipment shall consist of the following: protective clothing of material to protect the skin from heat radiating from the fire and from burns and scalding by steam. The outer surface shall be water-resistant. SEE NARRATIVE FOR ADDITIONAL INFORMATIONYes
Resolved DateResolution
Feb 05, 16VESSEL RECIEVED NEW FIREFIGHTING OUTFITS.
4940644 New Orleans, Louisiana Aug 03, 14 Vessel Inspection - Administrative Action
4840097 New Orleans, Louisiana Apr 29, 14 Vessel Inspection - Approved Inspection
  1
SystemSubsystemCause
ElectricalElectrical Distribution System (service)
DescriptionDue DateResolved
0950- Electric equip in general- The conditions of the ship & its equip shall be maintained to conform w/ the provisions of the present regs to ensure the ship is fit to proceed to sea. Observed the casing on an intrinsically safe installation disconnected from the bulkhead & repaired w/ electrical tape. Technician's report w/ concurrence from class attesting to proper repair. - SOLAS(09) I/11Apr 29, 14Yes
Resolved DateResolution
Aug 03, 14PSC NOLA received a class report from DNV-GL satisfying the requirement.
4593293 Warrenton, Oregon May 16, 13 Vessel Operational Control - Agency Action Complete
4546725 San Juan, Puerto Rico Mar 11, 13 Vessel Inspection - Approved Inspection
4546711 San Juan, Puerto Rico Mar 11, 13 Vessel Inspection - Agency Action Complete
4234868 New Orleans, Louisiana Feb 04, 12 Boarding - Agency Action Complete
4234869 New Orleans, Louisiana Feb 04, 12 Vessel Inspection - Approved Inspection
  6
SystemSubsystemCause
EngineeringFuel Oil Storage/Transfer System
DescriptionDue DateResolved
0899-Acid prev(other)-Each transfer pipe system must not leak under static liquid pressure test at 1.5 times MAWP. The frequency of the test must be annually. The vessel cannot provide documentation attesting to the pipe being hydrostatically testing to 1.5 times MAWP. Provide documentation attesting to proper test prior to bunkering or lube oil transfer in US-33 CFR 156-.170Mar 12, 13Yes
Resolved DateResolution
Mar 12, 13
SystemSubsystemCause
PersonnelTraining
DescriptionDue DateResolved
0899-Other(acid. prev.)-Every vsl of over 400 GT shall carry a NTVRP w/which the crew shall be trained on. Vsl master stated he received the NTVRP upon arrival in NOLA & has not conducted crew training IAW Section 6 of the plan. Vsl conducted QI notification when PSCO was onboard. Conduct crew training IAW section 6 of NTVRP & provide documentation to CG-33USC1321Feb 18, 12Yes
Resolved DateResolution
Mar 12, 13
SystemSubsystemCause
Construction/LoadlineMarkings
DescriptionDue DateResolved
1220-Freeboard marks-The rings, lines, and letters of the Load line Mark shall be painted in white or yellow on a dark ground or in black on a light ground. The ring, lines, and letters on the starboard side of the vessel are badly rusted and no longer white or yellow on a dark ground-ICLL Reg. 8Yes
Resolved DateResolution
Feb 17, 12Received, reviewed, and accepted class report from DNV stating they verified the load line marks have been satisfactorily repainted.
SystemSubsystemCause
DocumentationLogs/Records
DescriptionDue DateResolved
1710-Oil record book-Each operation required to be in the ORB shall be completed IAW MARPOL. PSCO observed 10 OWS operations in MEPC 107(49) approved OCM between 30SEP11-2FEB12 omitted from the ORB. During same time, 4 OWS op entries were logged in the ORB equally 20m3 processed and discharged overboard. Provide corrective action plan from company w/concurrence from admin-MARPOL Annex I/17Feb 18, 12Yes
Resolved DateResolution
Feb 17, 12Received, reviewed, and accepted class report from DNV stating they accepted Corrective Action Plan and ensure implementation.
SystemSubsystemCause
Operations/ManagementEPA Vessel General Permit (VGP)
DescriptionDue DateResolved
9900-Other (not clearly hazardous)-The vsl master and senior crew on board could not produce a VGP and did not appear to be aware of the requirements outlined in the VGP. PSCO provided the master and crew with a copy of the EPA VGP fact sheet-33 USC 1251Yes
Resolved DateResolution
Feb 04, 12This deficiency is considered corrected as the vessel''s master was advised of US EPA VGP requirements.
SystemSubsystemCause
Operations/ManagementEPA Vessel General Permit (VGP)
DescriptionDue DateResolved
9900-Other (not clearly hazardous)-Vsl's must complete visual inspections IAW section 4 of the VGP. The master/crew could not produce documentation that the visual inspections have been conducted or recorded. The PSCO advised the master that the vsl must complete routine visual inspections weekly and comprehensive annual inspections-33 USC 1251 and VGP Part 4Yes
Resolved DateResolution
Feb 04, 12This deficiency is considered corrected as the vessel''s master was advised of US EPA VGP requirements.
Documents Issued Expires Agency
Classification Document February 17,2015 April 22,2020 DNV GL
International Load Line Certificate February 17,2015 April 22,2020 DNV GL
International Oil Pollution Prevention Certificate February 17,2015 April 22,2020 DNV GL
ISM - Document Of Compliance May 20,2013 May 14,2017 BV
ISM - Safety Management Certificate August 5,2016 September 9,2020 DNV GL
Minimum Safe Manning Document October 10,2013 PA
SOLAS Cargo Ship Safety Construction Certificate March 16,2015 April 22,2020 DNV GL
SOLAS Cargo Ship Safety Equipment Certificate February 17,2015 April 22,2020 DNV GL
SOLAS Cargo Ship Safety Radio Certificate February 17,2015 April 22,2020 DNV GL
Tonnage Certificate, International April 22,2010 NKK